A brief analysis of the transformation process of coating production line
Time:2012-10-22 11:51:38

       The painting production line of the complete machine is designed by the former First Design and Research Institute of machinery Industry, which adopts the advanced and mature industrial art in China at that time, and improves the mechanization and automation level of the painting production line, so as to improve the working environment and reduce the labor intensity of workers. At the same time, it has earnestly implemented the relevant state laws and regulations, norms and standards, and worked hard to do a good job in environmental protection and occupational safety and health.


       The whole production line by line, drying, screening, drying, paint on the surface and, offline 7 station such as composition, except on and off the five stations by an organic water drying room, shielding room, water spray paint room, flow flat room and dry room of a closed production line, and workshop is separated, ensures the whole paint areas relatively clean. In addition, a complete machine cleaning section is built at one end of the workshop for secondary cleaning of the complete machine. The whole machine adopts double board ground chain transportation to improve the mechanization level.


       Process flow: water gun oil removal cleaning -- on line -- hot air drying -- shielding -- surface paint spraying -- leveling -- drying -- removing shielding -- off line.


       The operation time of each station is 45min, and the cycle time of the pipeline can be adjusted appropriately according to the actual use.


       The paint varieties are komatsu yellow acrylic polyurethane enamel and the spray gun is electrostatic mixed air spray gun.


       The coating production line can produce 2000 loaders per year when only units are arranged for production. The total number of designers in the coating workshop is 24, including 16 production workers. The average annual output of each production worker is 142 loaders.


Second, the question raises

       After 2003, due to the country to increase the investment in infrastructure, the loader industry into the good situation of flourishing production and marketing, several major loader production enterprises have reached their maximum output record. At the same time, each manufacturer has improved the appearance quality. The paint is mainly used to color the loader. The loader's appearance color is divided into two parts, which changes the loader's single color for a long time.


       With the increase of loader output and the extensive use of exterior paint color registration, several problems occurred in the application process of complete machine coating line:

       (1) the surface spray paint tinted homework makes loader shorter time () down on a painting area, and screen instead of to shorten the time, and extension of trend, make the whole assembly line beat changed, when in low yield, but increased the waiting time for some station, yield increase and then need to be partially blocked work offline.

       (2) Due to the shortened beat of the entire production line, there is a heating process in the water mark drying room, so that the temperature just rises to the specified temperature and sometimes even does not rise to the specified temperature, it needs to be transferred to the next station, which cannot play a role at all. However, the water mark drying room is a pass-through type, and the temperature immediately drops to the ambient temperature after the door is opened.

       (3) The drying room also has the same problem as the water mark drying room, which cannot give full play to the drying role.

       (4) The door of each chamber adopts pneumatic door, the time of switch is long, fully open or completely close is about 3-5min, in the whole beat is long (45min), do not feel, after the beat is shortened it seems a little too long.

       (5) the utilization rate of the waste gas treatment device is too low, because the exhaust gas in the paint room is fully mixed with water, and the air volume is large, so the organic solvent content discharged into the atmosphere can meet the emission standards. The drying chamber USES the hot air circulation, a small part of the exhaust gas emissions, this small part of the exhaust gas may exceed the standard, so most of the production lines have added activated carbon adsorption device.


3. Suggestions for improvement

       It is impossible to solve the above problems by using the current intermittent pass-through production line. To completely solve the above problem, only fundamentally change the production line type, or like a car factory adopted by type production line, continuous operation, every room body is longer, the whole production line without door, drying room a preliminary drying and strong cold area, and use the wind curtain interception heat, or use the Chambers and decorate, a spray room with 2-3 drying room, loader into the drying chamber immediately after spray paint, flat, drying in the process of heating up, some large-scale passenger car manufacturer both in this way.


Iv. Practical operation

With the increasing production of loaders, the measures taken by our company are as follows:

       1) After cleaning and removing oil, the loader should take the way of natural cooling and drying, pay attention to maintain balanced production, if the weather is bad, use the night time to dry.

       (2) When the production line is in operation, the water-mark drying room does not work, and most of the shielding work is carried out offline.

       (3) All the doors of the room are closed when painting, in order to save time. In this way, it is easy to cause the paint mist to fly to the shielding room and leveling room next to the paint room.

       (4) A new 720m2 hangar will be built for parking the loader sprayed with paint, and the painting and decoration work will be carried out here; When the temperature is low, use the evening time to dry.

       (5) Make some baffles of shield glass with tin sheet to save the time of shield glass.

    

       Through the above measures, the company has ensured the painting workshop in the case of no night shift, Nissan 15-20 loaders. Of course, the above measures are a little harmful to the production line. In order to improve the problem of drying in winter, the company plans to build a new drying room for drying the paint of the whole machine, and prepare to move the water-mark drying room below the line to play its role.

Service hotline

020-36860788

WeChat

Feedback

Feedback

主站蜘蛛池模板: 色老板精品凹凸在线视频观看 | 精品久久久无码人妻中文字幕豆芽 | 国产在线无码精品无码 | 日韩在线视频观看免费网站 | 免费无码又爽又刺激高潮的动态图 | 免费无码又爽又刺激高潮的漫画 | 亚洲欧美国产免费综合视频 | 国内毛片毛片毛片毛片 | 成人免费视频高清 | 国产亚洲精品aaaa片小说 | 无码色偷偷亚洲国内自拍 | 亚洲人成77在线播放网站 | 人人妻人人添人人爽欧美一区 | 黄色大片在线播放 | 神马影院一区二区三区 | 天天艹天天 | 国产欧美精品一区二区三区四区 | 337p粉嫩大胆噜噜噜 | 久久超碰97中文字幕 | 逼逼爱插插网站 | 亚洲日日射 | 九九热re | 国产又色又爽又高潮免费 | 最近中文字幕在线中文高清版 | 男人天堂综合网 | av色在线观看 | 日韩成人无码毛片一区二区 | 中文字幕在线免费看 | 国产精品无码永久免费不卡 | 在线视频一区二区 | 亚洲精品一本之道高清乱码 | 男ji大巴进入女人的视频小说 | 四虎成人精品永久在线视频 | 四虎国产精品成人免费入口 | 国产美女脱的黄的全免视频 | 伊人网伊人网 | 久久久在线免费观看 | 在线观看片免费视频无码 | 伴郎粗大的内捧猛烈进出视频观看 | 18禁美女裸体无遮挡免费观看国产 | 欧美日韩系列 | 国产精品羞羞答答在线 | 污污视频在线看 | 人妻精品制服丝袜久久久 | 狠狠亚洲超碰狼人久久 | 在线91av| 亚州av网| 日日噜噜夜夜狠狠视频免费 | 亚洲最大福利视频网 | 99久久网站| 日韩成人无码毛片一区二区 | 18禁免费吃奶摸下激烈视频 | 亚洲欧美在线x视频 | 久久久久久久蜜桃 | 四虎影视国产精品永久地址 | 人妻无码久久中文字幕专区 | 午夜毛片不卡免费观看视频 | 未满十八18禁止免费无码网站 | 国产精品你懂得 | 91婷婷射 | 日本三级欧美三级人妇视频 | 亚洲va欧美va国产综合 | 久久久久久久久精 | 国产色多传媒网站 | 国产成人麻豆精品午夜福利在线 | 国产精品自在拍在线拍 | 久久亚洲精品无码va大香大香 | 国产公开久久人人97超碰 | 日韩欧美在线观看免费 | 色妞av永久一区二区国产av | 最新69成人精品视频免费 | 98国产精品视频 | 国产巨大爆乳在线观看 | 国产黄a三级三级三级 | 人妻被修空调在夫面侵犯 | 亚洲毛片儿 | 国产在线视频在线观看 | 日日夜夜综合 | 97视频在线观看免费 | 伊人久久大香线蕉综合啪小说 | 夜鲁很鲁在线视频 | 高潮潮喷奶水飞溅视频无码 | 浪潮av激情高潮国产精品 | 波多野结衣小视频 | 久久99av无色码人妻蜜 | 亚洲国产精品成人无久久精品 | 午夜理论片在线观看免费 | 日本最新中文字幕 | 一级黄色激情片 | 亚洲国产高清aⅴ视频 | 太粗太深了太紧太爽了动态图男男 | 日本一区二区视频在线 | 色悠久久久久综合网国产 | 久久成人激情视频 | 亚洲成人91 | 日本在线不卡一区 | 国产边摸边吃奶边做爽视频 | 国产精品视频观看 | 日本91av|