       The car bumper is the car important exterior decoration part, along with the car coating request unceasing enhancement, the bumper coating also more and more receives each specialized factory's attention. Car bumper mainly adopts plastic material, coating on the surface is difficult to attach, and low thermal deformation temperature of the plastic parts, generally in use in the production of paint drying temperature is lower than the drying temperature of the coating used of the metal, so the plastic coating and metal coating are quite different in process and coating materials, bumper painting with car coating commonly mixed production line. At present, some large domestic automobile manufacturers have taken the injection molding and painting of the bumper as an important part of vehicle production, and built the injection molding and painting workshop of the bumper when planning the new factory. For example, Toyota has built a resin workshop (namely the injection molding and painting workshop of the bumper and other plastic parts) in the domestic construction factory. The bumper of some automobile factories in China is provided by the large-scale professional plastic parts processing factory, and the large-scale automobile plastic parts production factories in China include Jiangyin molding and Shanghai Yanfeng Weistong, etc.


       The design of a number of bumper coating lines in China has absorbed the experience and technology of Japan, South Korea, Europe and The United States, etc. These coating lines have many different places in the process, equipment layout and mechanized form. In order to reduce the processing cost of plastic bumpers and improve their coating quality, a lot of researches have been made on coating materials, coating process and coating equipment, etc., and some achievements have been made. Therefore, the coating line design has undergone great changes in recent years.


1. Overall layout of coating line

       The overall arrangement of large coating lines tends to be regionalized and three-dimensional. The same or similar equipment and processes should be arranged in the same area as far as possible to facilitate the organization and management of production. The first floor is mainly equipped with upper and lower parts, pre-treatment, polishing, inspection, decoration and auxiliary equipment; The second floor is mainly equipped with spray painting room, drying room and air conditioning platform area. This three-dimensional arrangement of equipment is more conducive to improve the cleanliness of the spraying clean area, which is of great help to improve the qualification rate of the products off the production line at one time. The whole coating workshop is fully enclosed workshop, artificial all standing in line at the upper and lower parts of the unilateral operation, bumper painting takes the form of automatic spraying combined with artificial spray, spray paint room concentrated air exhaust emissions or dust emission concentration after burning, for centralized paint system for paint combined with line and small system for the model.


2 Coating materials

       Plastic bumper heat resistance is poor, when high temperature easy deformation, so the bumper coating generally cannot choose drying temperature is too high coating, drying temperature is about 80±5℃ and 120±5℃ for domestic paint. The bumper coating is composite coating namely primer + color paint + varnish, primer has two components and one component two, color paint mostly USES one component paint, varnish mostly USES two components paint. The two-component primer has a better covering force after baking, and can polish the surface particles and other paint defects, especially suitable for the appearance of the plastic parts are poor, but the two-component primer under the wet film state of electrical conductivity is generally poor, such as the primer is not dried spraying paint will affect the adhesion of color paint. Two - component varnish wide construction range, compared with one - component varnish, with less pollution, easy to adjust the advantages. The application of two-component primer and varnish system has disadvantages such as large equipment investment and complex maintenance of paint conveying pipeline, but the paint itself is easy to be adjusted, and it is easy to obtain a good surface condition of paint film.


       The 3C1B process can save the one-time investment of equipment and the operating cost of equipment in the later stage. The existing plastic bumper coating line with large production capacity in China adopts this process form and has been put into mass production with relatively stable operation. Considering 3 c1b coating process in the domestic application in coating production line design is less, and 3 c1b technology in coating construction parameter control, coating field management, coating performance pledge, a referral qualified rate of products, as well as a certain risk, mostly European and American automobile manufacturers at the same time the required 3 c2b technology on bumper painting, so some coating production line in domestic press 3 c2b process design and construction at the same time also can achieve 3 c1b technology forms.


3.2 prior to processing

       The pretreatment of the plastic bumper before painting is mainly to remove the dust, oil and residual release agent on the surface of the workpiece, and at the same time to activate the surface. Poor pretreatment can lead to poor adhesion, shrinkage cavity and particle defects. There are two forms of pretreatment, one is automatic spraying, the other is manual wiping. Automatic spraying is to hang the workpiece on the conveying equipment through the pretreatment spray line, the main process is: pre-degreasing → degreasing → washing 1→ washing 2→ fresh DI washing → water blowing → moisture drying → strong cold; Manual wipe is mainly used to wipe the whole workpiece surface manually with solvent, which can reduce the one-time investment of equipment and its operating cost. Domestic large quantities of plastic bumper coating line mostly adopts automatic spraying, small quantities of bumper coating and small parts coating mostly adopts manual wiping method.


3.3 Flame treatment

       The flame treatment further activates the workpiece surface. The robot jets flames to the surface of the workpiece. Manual and automatic electrostatic removal procedures are set after the flame treatment process to enhance the binding force between the workpiece and the coating film.


3.4 on the cover

       On the screen is mainly on the surface of the workpiece some do not need to be sprayed on the area to cover processing, the general line more difficult to cover, using more line shielding.


3.5 spray paint

       Workpiece spraying mostly adopts the combination of robot automatic spraying and artificial spraying, first automatic spraying, and then manual inspection of supplementary spraying. Some production lines can be completely automatic spraying after commissioning and enter into mass production. Automatic painting mainly adopts robot spraying. Generally, air spray gun is used for primer, cup rotary workstation + spray gun workstation is used for color paint and spray gun + cup workstation is used for varnish 2 workstations.


4 Coating equipment

       The equipment of plastic bumper coating line mainly includes mechanical conveying equipment, pretreatment equipment, flame treatment equipment, spray painting room equipment, drying furnace and artificial working area equipment, etc.


4.1 Mechanical conveying equipment

       Plastic bumper spraying line mechanized conveyor equipment in the form of more, there are general suspension conveyor chain, reverse cumulative chain and skid transport form. Skid transport layout is flexible and changeable. In recent years, many production lines built in China have adopted skid transport, while Japanese bumper coating line mainly adopts reverse cumulative chain. Considering that some equipment of the pretreatment process conveying system has the requirements of waterproofing and anti-rot and the influence of drying process temperature, the driving device of the skid conveyor system in the general pretreatment and drying process adopts the external type.


4.2 Pre-processing equipment

       The pretreatment equipment mainly includes non-standard equipment, circulation system and exhaust system. The degreasing liquid of plastic bumper is slightly acidic (pH value is generally around 6.4), which is different from the degreasing liquid of car body, so the pre-treatment equipment should consider acid resistance, it is recommended that the pre-treatment closed chamber body and tank body adopt stainless steel material. The top of the pre-treatment equipment room is equipped with an exhaust fan to avoid the gas diffusion to the outside of the room. It is suggested that a maintenance platform, a maintenance door and a cantilever searchlight be installed on one side of the pre-treatment room to facilitate the maintenance and repair of the equipment.


3 Coating process

       3.1 Main process forms of coating line

       Commonly used coating process for: plastic bumper on a - before treatment - water on the dry and cold - flame treatment - covered - in addition to static electricity - spray primer - flow flat - primer to dry and cold - primer inspection/ground - in addition to static electricity - spray paint to flow flat - spray varnish - flow flat, paint to dry and cold - inspection - under a - defects repair. The above process flow is three spray and two bake (3C2B) process, and there is also a three spray and one bake (3C1B) painting process (the process of "removing static electricity" after the "primer drying" to the primer in the above process flow is cancelled).


4.3 spray room

       The existing domestic painting production line of the spray painting room has The Van Winkle spray painting room, the water spin spray painting room and the water curtain type spray painting room and so on, now USES the Van Winkle spray painting room. There are two kinds of air supply and exhaust system in spray booth: fresh air and circulating air. The all-fresh air mode is that the air supply air conditioning unit in the spray chamber takes air from the outside of the chamber and sends it to the spray chamber after multi-stage treatment of the air conditioning unit. After the air is utilized in the spray chamber, the exhaust fan in the spray chamber is all discharged into the atmosphere. The circulating air mode is the air circulation utilization in the spray painting room (namely, the air enters the spray painting room through the air supply air conditioner, and then returns to the air supply air conditioner through the circulating air treatment equipment for reuse). The air exhaust in the spray painting room is not all discharged, only part of the discharge and part of the supplement. The amount of air supply and exhaust shall be calculated according to the balance of air flow in the spray chamber, the limit concentration of exhaust gas explosion in the spray chamber and the requirements of paint performance. Some production lines are designed to supplement the air flow with 10%, 30% of the total circulation air flow. The air volume of spray chamber exhaust and fill air should not be too low, too low will lead to the circulation of the wind organic solvent content is too high, easy to cause paint film surface gloss, and spray construction parameters control is more difficult. The concentration of exhaust gas in the spray chamber with circulating air is high (exceeding the requirements of national environmental protection standards), and the exhaust gas shall be incinerated back into the atmosphere (the exhaust gas after incineration can meet the national environmental protection requirements). The temperature of the painting room is generally required to be controlled at about 23℃, heat exchange in winter, refrigeration in summer, the use of fresh air coating production line energy consumption is large. The use of circulating air conditioning can reduce the energy consumption of production line (comprehensive energy consumption can be reduced by more than 30%, the installed power of related equipment can be reduced by 40%), and save the operating cost. Spray chamber adopts circulation air supply, corresponding spraying form should adopt automatic spraying, because the circulation air harmful gas content is high, not suitable for manual operation, such as artificial spraying should wear clothing and masks with anti-gas function.


4.4 drying furnace

       Baking furnace are mainly in the form of straight through, bridge and П type 3 kinds. The mechanical conveying of Japanese coating production line mostly adopts the form of reverse cumulative chain, and the drying furnace is the bridge drying furnace. Europe and the United States system using light skid transportation system, drying furnace for drying furnace П type. Double stroke drying oven is used to reduce heat dissipation area and energy consumption.


4.5 Paint supply system

       There are two paint systems, one is the centralized paint system, that is, all the paint is concentrated in a specific area for deployment, the centralized paint system to be arranged in the distance of three paint rooms near the place, to reduce the paint pipe passing long caused by the pressure loss and temperature loss, and avoid the pipeline cleaning difficulties; The other is the line edge system, that is, the paint transfer equipment is placed near the spray chamber. The volume of paint supplying tank used by the line-edge system is relatively concentrated, so the line-edge system is also known as the small system. The advantage of the small system is that it can meet the spraying production under the condition of small paint feeding. It can be used for infrequent production of color paint, new color trial production and temporary adjustment of color coating. A centralized paint system is used for primers, varnishes, and several high volume paints.


5 conclusion

       Countries to work more and more attention to environmental protection, the state environmental protection administration has issued the relevant standard of clean production, coating line will be more and more strict emissions, car coating production line has been developed to the direction of water paint, bumper painting is also bound to develop in the direction of the water-based coating, the domestic has been bumper painting line using water-based paint coating.

Service hotline

020-36860788

WeChat

Feedback

Feedback

主站蜘蛛池模板: 午夜伦4480yy私人影院久久 | 日本一卡2卡3卡4卡5卡精品视频 | 国产亚洲欧美日韩在线一区二区三区 | 色婷婷av一区二区三区之红樱桃 | 精品无码人妻被多人侵犯av | 欧美精品色呦呦 | 亚洲精品国产成人av蜜臀 | 国产-第1页-草草影院ccyy | 18禁床震无遮掩视频 | 特黄一级大片 | 一区一区三区四区产品动漫 | 亚洲精品无码av中文字幕电影网站 | 国产免费av片在线 | 国产精品自在在线午夜蜜芽tv在线 | 日韩黄色片在线观看 | 国产末成年av在线播放 | 免费不卡无码av在线观看 | 国产中文在线视频 | 国产亚洲精品久久久久久小说 | 国产精品久久久久久久久久久久 | 在线播放国产麻豆va剧情 | www.毛片.com | 亚洲3p | 亚洲精品国偷拍自产在线 | 亚洲三区在线观看无套内射 | 黄色小视频在线播放 | 成人av一区二区三区在线观看 | 欧美性视频网站 | 狠狠色噜噜狠狠狠狠色综合久av | 亚洲欧美色一区二区三区 | 性色一区二区三区 | 中文字幕日韩精品欧美一区蜜桃网 | 蜜桃精品成人影片 | 日本精品videosse×少妇 | 帮老师解开蕾丝奶罩吸乳视频 | 伦理片一区二区 | 亚洲国产2021精品无码 | 三级黄色片免费 | 欧美不卡二区 | 久久99精国产一区二区三区四区 | 一级a性色生活片久久毛片 av2018 | 亚洲欧美国产毛片在线 | 人妻人人澡人人添人人爽人人玩 | 欧美久久久久久久久久久 | 欧美黑人xxxx又粗又长 | 国产精品毛片在线完整版 | 97人伦色伦成人免费视频 | 狠狠色噜噜狠狠狠狠97俺也去 | 一区二区不卡视频在线观看 | 成人激情小视频 | 无码中文精品专区一区二区 | 国产www在线观看 | 黄色91免费 | 日本乱偷人妻中文字幕 | 色一情一乱一乱一区99av白浆 | 国产精品香蕉视频在线 | 成人网18免费网站 | 精品国产免费第一区二区三区 | 校园春色自拍偷拍 | 色呦呦在线 | 日韩在线三区 | 国产东北肥熟老胖女 | 日本中文字幕在线观看视频 | 久久久精品视频在线 | 亚洲高清国产av拍精品青青草原 | 在线天堂www在线资源下载 | 欧美日韩网站 | 色八区人妻在线视频 | 校园春色中文字幕 | 五月婷婷六月色 | 欧美牲交a欧牲交aⅴ久久 | 人妻熟女αⅴ一区二区三区 | 少妇无码av无码专区线y | 91精品免费在线观看 | 中文字幕日韩一级 | 免费看性视频xnxxcom | 国产精品免费一区 | 好男人资源在线社区 | av在线亚洲欧洲日产一区二区 | 伊人亚洲影院 | 国产麻豆精品传媒av国产婷婷 | 天堂色区 | 熟女毛多熟妇人妻在线视频 | 欧美极品第一页 | 久久狼人大香伊蕉国产 | 亚洲阿v天堂无码z2018 | 韩国av一区二区三区 | 中文乱码字幕高清一区二区 | 找黑人做爰富婆国产 | 秋霞毛片少妇激情免费 | 欧美丰满熟妇多毛xxxxx | 国产日韩欧美综合在线 | 久久久免费网站 | 韩国成年人网站 | 性夜影院午夜看片 | www.国产com | 在办公室被c到呻吟的动态图 | 久久久久国产精品人妻aⅴ武则天 | 97久久久亚洲综合久久88 |